year 2005 |
|
Founded |
year 2008 |
|
Built 155m tunnel kiln |
year 2009 |
|
Built a comprehensive building |
year 2011 |
|
Take the lead in completing the "coal to gas" project in the tunnel kiln, and dismantle the gas generator, down furnace and other equipment |
|
|
Built a fully automatic high temperature shuttle kiln |
|
|
Established a production, research and research base in cooperation with Henan University of Science and Technology |
|
|
Established a chemical analysis and physical testing laboratory |
year 2012 |
|
Completed a fully automatic high-temperature shuttle kiln and equipped with related equipment |
year 2013 |
|
Completed a sales office building |
year 2014 |
|
Built a micro-compound building and equipped with a docking automatic batching system |
|
|
Obtained a production license for industrial products |
year 2015 |
|
Built a special high-temperature material workshop, equipped with 1250T press, 630T press, 500T hydraulic press and other equipment |
year 2016 |
|
Built a high temperature tunnel kiln |
year 2019 |
|
A new micro-fitted building for high-temperature materials workshop, equipped with 2 sets of 630-ton presses and 1 set of 2100-ton hydraulic presses |