| year 2005 | Founded | |
| year 2008 | Built 155m tunnel kiln | |
| year 2009 | Built a comprehensive building | |
| year 2011 | Take the lead in completing the "coal to gas" project in the tunnel kiln, and dismantle the gas generator, down furnace and other equipment | |
| Built a fully automatic high temperature shuttle kiln | ||
| Established a production, research and research base in cooperation with Henan University of Science and Technology | ||
| Established a chemical analysis and physical testing laboratory | ||
| year 2012 | Completed a fully automatic high-temperature shuttle kiln and equipped with related equipment | |
| year 2013 | Completed a sales office building | |
| year 2014 | Built a micro-compound building and equipped with a docking automatic batching system | |
| Obtained a production license for industrial products | ||
| year 2015 | Built a special high-temperature material workshop, equipped with 1250T press, 630T press, 500T hydraulic press and other equipment | |
| year 2016 | Built a high temperature tunnel kiln | |
| year 2019 | A new micro-fitted building for high-temperature materials workshop, equipped with 2 sets of 630-ton presses and 1 set of 2100-ton hydraulic presses |